| Brand Name: | Zhongli Amusement |
| Model Number: | Air filled dome |
| MOQ: | 500 square meter |
| Price: | 500-999 square meters:$60 ; 1,000-1,999 square meters:$55 ; 2,000-4,999 square meters :$52;≥5,000 square meters :$50 |
| Payment Terms: | L/C,D/A,D/P,T/T,Western Union |
| Supply Ability: | 5 sets per month |
Standard fixed shelters block tower cranes and long-boom excavators from lifting heavy structural materials out of deep pits.
Sudden downpours turn open excavations into mud pits, damaging slope stabilization walls and halting work.
This telescopic steel-truss shelter slides along ground rails, opening up specific pit segments on demand for crane access while keeping active digging zones covered.
Engineered galvanized steel trusses designed to resist seismic forces and heavy wind loads.
Precision motorized drive units ensure smooth, synchronized sliding along foundation perimeter beams.
Overlapping flexible rubber seals between telescoping segments ensure zero water leakage during torrential rain.
Easily extended or shortened by adding or removing frame modules as excavation progresses.
Motorized drive systems retract a 30-meter section in under 5 minutes for immediate crane access.
Yes, custom rail leveling brackets adapt to irregular concrete capping beams and slope topographies.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()